S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
35. A licence holder who mixes fluids from a well or a group of wells must, 30 days before measuring the production flow of the pool, notify the Minister of the method, the frequency and the duration of the measurements, indicating the manner in which the total production of each of the mixed fluids will be allocated to each of the wells.
O.C. 1251-2018, s. 35.
In force: 2018-09-20
35. A licence holder who mixes fluids from a well or a group of wells must, 30 days before measuring the production flow of the pool, notify the Minister of the method, the frequency and the duration of the measurements, indicating the manner in which the total production of each of the mixed fluids will be allocated to each of the wells.
O.C. 1251-2018, s. 35.